Specifications
Class – A1, Self Elevating Unit + AMS + ACCU + DP2 + CRC Year of Build 2016
GMS Sharqi is an S Class self-propelled, self-elevating accommodation DPII jackup barge. It is capable of providing well service, construction, installation and accommodation capabilities for up to 150 persons. GMS Sharqi has a 150t crane and can operate in water depths of up to 55m.
Main Particulars
Description
|
Imperial
|
Metric
|
LOA / Length BP:
|
252.62 ft / 183.72 ft
|
77 m / 56 m
|
Beam:
|
104.9 ft
|
32 m
|
Depth:
|
18 ft
|
5.5 m
|
Draft:
|
11.48 ft
|
3.5 m
|
Variable Load:
|
2744 Klbs
|
1245 t
|
Leg Length: (4x Lattice)
|
246 ft
|
75 m
|
Water Depth:
|
180 ft
|
55 m
|
Propulsion
|
DP2, 4 x 825 kW Thrusters
|
Cranes
|
Main Crane
|
330 Klbs
|
150 t
|
Aux Cranes
|
33 Klbs
|
15 t
|
POB
|
150
|
Helideck – CAP 437 compliant
|
D value 22.2m / Sikorsky 61N+92N
|
Light Well Intervention Cantilever Option
Description
|
Imperial
|
Metric
|
Cantilever Main Skidding Range
|
49 ft
|
15 m
|
Transverse Skidding (Skid Frame)
|
26 ft
|
8 m
|
Length of Cantilever
|
89 ft
|
27 m
|
Width of Cantilever
|
28 ft
|
8.5 m
|
Height of Cantilever: External/Internal
|
11.5 ft / 9.8 ft
|
3.5 m / 3m
|
Load Capacities
|
CT Reel/ Power Stand
|
220 Klbs
|
100 t
|
Cantilever Mid/ Lay down Area
|
88 Klbs
|
40 t
|
Work Deck Area/ Well Access
|
220 Klbs
|
100 t
|
Applications
SIMOP
|
Well Intervention on 2 well
|
Well Intervention with production on adjacent wells
|
Enhanced CT Ops
|
ESP Replacement
|
Coil Tubing Drilling & Milling
|
Well Intervention on Platforms with Structural Integrity issues
|